Via Verdi Repair Project San Pablo Creek Culvert Replacement

Job #3686

Job Description: This  project consisted of reconstruction of Via Verdi as well as the construction of a reinforced concrete box culvert at the intersection of Via Verdi and El Portal Drive in Richmond, California. Project size: $5.7mm

Additional Information: Scope included excavation of the existing corrugated metal pipe CMP culvert, demolition of the remaining portions of the existing CMP culvert, temporary dewatering of the San Pablo creek channel, reinforced concrete headwall, endwall, and 45 degree reinforced culvert bend, concrete box culvert, temporary utility relocation, road reconstruction, underground utility reconstruction, protection of 54” EBMUD water transmission main, drainage inlets, curb and gutter, sidewalk, curb ramps, fencing, guardrail, signing, striping, reconstruction of engineered fill terrace, temporary and permanent erosion control measures, creek bank stabilization measures, reinforced concrete retaining wall, and demolition and  disposal of asbestos bonded steel retaining wall.