I-5 Overlay: Tracy to Los Banos

Job #3786

Job Description: This project involves construction of over 260,000 TNS of rubberized hot mix asphalt for over 40 miles of freeway. The project management team partnered with Caltrans and created a Value Engineering Change Proposal that deleted approximately 30,000 TNS of hot mix asphalt by merely altering the slope of the outside shoulder. The VECP resulted in a net savings of $1.8mm for the state of California. Project size: $40mm